Irrigation and Large Pumping Rate Schedule

A. Availability

The Irrigation and Large Pumping Rate Schedule applies to electric service required for pumping service at locations where the installed motor capacity is ten horsepower or greater. The horsepower for billing purposes shall be the manufacturer’s motor nameplate rating, or, at its option, the Cooperative may determine the horsepower by test under conditions of maximum operating load.

B. Character of Service

Three-phase alternating current service will be provided, at approximately 60 cycles. Voltage supplied will be at the discretion of the Cooperative and will be determined by the voltage available from distribution lines in the vicinity and/or other conditions. Frequency and voltage shall be subject to reasonable variation.

At the discretion of the Cooperative, and subject to engineering study, single-phase service may be furnished in locations where three-phase service is not available.

C. Rate

Annual Horsepower Charge:                   $27.50 per horsepower per year which shall be billed at $5.50 per hp per month from March through July

Distribution Energy Charge:                    $.04233 per kWh

D. Power Cost Pass-Through

In addition to the rates and charges described above, members will be billed a Power Cost Pass-Through for all kWh consumed.

E. Transmission Cost Pass-Through

In addition to the rates and charges described above, members will be billed a Transmission Cost Pass-Through for all kWh consumed.

F. Minimum Annual Charge

The minimum annual charge shall be $27.50 per horsepower or fraction thereof.