Important Information About Electricity Load Shedding and What It Could Mean to You

The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to more than 27 million Texas customers. ERCOT is responsible for ensuring that the supply of electricity is sufficient to meet system demand (load) for electricity in most of the state.

When electric supply provided by all available power generation plants, (thermal and renewable generation resources) and other sources becomes insufficient to meet the demand, ERCOT begins emergency operations. During a power emergency when electric supply cannot meet consumer demand for electricity and all other operational tools have been exhausted, the demand for electricity must be reduced to avoid uncontrolled blackouts.

As a last resort, ERCOT will instruct electric utilities to implement controlled customer outages to reduce the demand for electricity on the ERCOT grid. This is referred to as load shed
and will last until the power emergency is resolved by ERCOT.

Typically, before calling for controlled customer outages, ERCOT takes steps to reduce the demand on the electric grid by asking all types of consumers to reduce electric usage. Electric
utilities, including Central Texas Electric Cooperative (CTEC), via CTEC’s ERCOT Transmission Operator, Lower Colorado River Authority Transmission Services Corporation (LCRA TSC), are obligated to immediately implement load shed procedures when ERCOT instructs.

 

During customer load shed events:

All members should assume their power could go out without advanced warning. Efforts will be made, as much as possible, to provide advanced notification of pending outages, but
circumstances do not always allow that to happen.

Members designated as Critical Load, in accordance with PUC guidelines, are not guaranteed an uninterrupted supply of electricity. It is the responsibility of the retail member to
make necessary arrangements for alternative sources of electric power should a localized outage or load shed event occur.

Residential members dependent on electric-powered medical equipment, such as those designated as Critical Care or Chronic Condition, in accordance with PUC guidelines, are encouraged to have a solid back-up plan in the event they lose electricity. It is important to note that these members are not excluded from controlled outages and may lose power during a load shed

Electric utilities will prioritize continuity of service for certain accounts whose service is critical to the community during an emergency or those whose service provides major support to the integrity of the electric system during an emergency. Examples include hospitals and certain public safety accounts.

Because a load shed event is an emergency order from ERCOT based on a shortfall of electricity being generated, electric utilities, including CTEC / LCRA TSC, do not have the information
to be able to notify individual members if they may lose power, when they may lose power or how long the load shed event may last.

In extreme power emergencies, ERCOT may require electric utilities to shed large amounts of load over long periods of time. In these instances, electric utilities like CTEC / LCRA TSC
may not have the ability to rotate outages without risking the stability of the entire electric grid. When this happens, some members may be without power for an extended period of time.
These outages are critical for ensuring the integrity of the state’s electric grid and preventing a system-wide blackout, which could be long-lasting and have a significant impact
on all aspects of life.

Electric utilities are required to continue to comply with ERCOT controlled customer outage instructions until ERCOT determines that outages are no longer required.

The Public Utility Commission of Texas website (Hot and Cold Weather, and General EnergySaving Tips) provides examples for members to reduce electricity use at times when involuntary
load shedding events may be implemented.

Regardless of the nature of the load shedding event, Central Texas Electric Cooperative, and the Cooperative’s ERCOT Transmission Operator (LCRA TSC) are committed to ensuring the
safe and reliable delivery of electricity to its members 24 hours-per-day, 7 days-per-week. While we may not control the issues or conditions that have required ERCOT’s order to shed
load, we will do everything in our power to restore electricity when we are able to safely do so. In addition, we will work to keep our members informed about the situation through local
media outlets, social media, and direct communications to you.

 

Tree Trimming and Vegetation Management

CTEC takes our responsibility to deliver safe and reliable energy to our customers seriously. Tree limbs or other vegetation that grow on utility poles and into power lines can cause fires, power outages, and damage to equipment or property. We encourage our customers to report any potential hazards to the electric system.

If you believe a tree is at risk of, or is in contact with the power lines, please contact 1-800-900-2832.

  • CTEC will prune only the parts that may contact electrical lines.
  • All debris left on the property and neighboring property will
    be CTEC’s responsibility. Getting permission from the neighbors
    impacted by this removal is the responsibility of the homeowner.
  • CTEC does not trim trees near service drops (pole-to-house).
  • CTEC members may request a temporary disconnect for safe trimming.

Rights of Way

Compatible Vegetation and Structures for Transmission Rights of Way

Grasses and Shrubs permitted below transmission lines.

Low-growing vegetation permitted between transmission lines and edge of right of way.

Incompatible Vegetation and Structures for Transmission Rights of Way

Taller-growing vegetation and structures are not compatible in the area between the transmission line and edge of the right of way.


Tree canopies should NOT extend under the transmission lines.